Summary of the Case
Challenges:
- Entrained solids plus chlorides
- Unlined CS process tank x 6
- 1 year in operation
- Pinhole leaks from erosion-corrosion
- Pitting up to 1 mm depth
ICE Impact:
- Analysis of risk vs. operation
- Specification of internal liner system
- QA/QC design and oversight
- Working well after 1 year in service