Summary of the Case
Challenges:
- High salinity washdown water = corrosion of structural steel
ICE Impact:
- Created a standard visual inspection proforma for steel in the process plant
- Collected quantitative corrosion data (coupons, UT measurements, exposure data)
- Created a corrosion risk map for tracking and predicting risk
- Updated the coating specification to match the risk type
- Carried out annual audit inspections to track risk and optimize repair