Challenges:
- Very high chloride exposure due to salts from the ore
- Concerns with integrity of concrete structures
- Client wanted to reach 70 years of service life
ICE Impact:
- Developed a service life model for the current design to find inefficiencies
- Investigated other corrosion control methods to reach the designed service life